Construction site       Time period  Service description      Daily output Transport range Total amount     Customer
Frankfurt Airport 03/04-05/05 Transports of grit, removal of building site rubble, transport of ready-mix 4.500 to.  10/75 km  1.500.000 to. Arge Kirchhoff-Heine
             
US Air Base Spangdahlem 08/04-12/04 Transports of grit
Transports of concrete
6.500 to.  4/40 km  325.000 to. Basalt-Union
Strabag
             
Schwaben-Galerie
Wolff & Müller
Stuttgart-Vaihingen
04/02-08/02 Removal of building site and excavation rubble 12.000 to.  10/75 km  800.000 to. DTS
             
T-Mobile Bonn 07/01-10/01 Removal of excavation rubble/gravel sand 12.000 to.  30 km  750.000 to. Kröll
             
Stuttgart Airport 08/01-10/01 Excavation
Transport of gravel
3.500 to.  40 km  200.000 to. Kirchhoff
             
New high-speed ICE line
Lot A
11/00-03/01 FSS and HGT transports 3.000 to.  20/30 km  250.000 to. Wittfeld
             
New high-speed ICE line
BAB A 3 reallocations
05/99-06/00 Transports of gravel and ready-mix 2.000 to.  10/30 km  250.000 to. Rheinische
Asphalt-
mischwerke

Region East

Construction site       Time period  Service description      Daily output Transport range Total amount     Customer
BAB 4 10/05 - 10/05 Transport of road construction material   2.000 to.  30 km  45.000 to. Bögl
             
BAB 71 09/05 -10/05 Transport of concrete   2.000 m³  7 km  37.000 m³ Walter Heilit
             
BAB 66 09/05 - 11/05 Transport of road construction material   2.200 to.  20 km  75.000 to. H. Kirchner
             
BAB 9 09/05 - 10/05 Transport of aggregates for mobile BMA Triptis   5.000 to.  55 km  100.000 to. Max Bögl
             
BAB 9 08/05 - 09/05 Transport of road construction material   3.500 to.  30 km  130.000 to. Bögl
             
BAB 38 07/05 - 11/05 Bitumen ready mix   1.800 to.  7-25 km  45.000 to. AML
             
BAB 71 07/05 - 08/05 Bitumen ready mix   2.000 to.  18 km  65.000 to. Walter Heilit
             
B 2 Profen - Pegau 05/05 - 09/05 Bitumen ready mix – Transport of milling goods   1.000 to.  25 km  25.000 to. AML
             
BAB 71 04/05 - 06/05 Transport of concrete   2.000 m³  6 km  70.000 m³ Meister
             
BAB 71 04/05 - 06/05 Transports of concrete and fluxe 5.000 to  10 km/ 
44 km 
  250.000 to. Meister
             
BAB 71 05/04 - 11/04 Transports of mineral compounds 4.500 to.  44 km    350.000 to. Meister
             
Gommla landfill 03/04 - 06/04 Transport of earth for covering of the landfill 3.000 to.  40 km    90.000 to. Walter- Heilit
             
BAB 9 Schleiz 08/04 - 09/04 u. 09/03 - 10/03 Delivery of sand for BMA, transports of concrete 2.000 to.  90 km   50.000 to. Berger Bau
             
BAB 38 03/03 - 07/03 Transports of gravel   8.000 to. 15 km    300.000 to. Kirchhoff
             
OU Eilenburg 08/02 - 12/02 Transports of mineral compounds 24 hour operation   8.000 to. 22 km    500.000 to. Walter-Heilit
             
BAB 9, Landsberg 07/02 - 08/02 Transports of earth for embankment 6.000 to.  15 km    240.000 to. Kirchhoff
             
BAB 9, Schleiz 08/01 -11/01 Transports of mineral compounds 3.000 to.  20 km    200.000 to. Kirchhoff
             
GWG Schmölln 05/00 - 07/00 Earth landfill with transport in shifts 6.000 to.  8 km    400.000 to. IMM
             
Lichtenberg landfill 08/99 - 11/99 Transports of earth for covering of landfill   4.000 to.  35 km    200.000 to. Lewerentz
             
BAB 4, Gera-Leumnitz/
Ronneburg
1997
(3 months)
Transport and delivery for foundation extension 2.000 to.  34 km    50.000 to. VBU, Schmölln
             
BAB 38 Late 1996 Grit and ready-mix deliveries 2.500 to.  20 km  55.000 to. Deutag/ Kirchhoff
             
Lippendorf generating plant (south of Leipzig) 1996
(3 months)
Delivery of filling gravel in round the clock shifts   7.000 to. 40 km  200.000 to. Heitkamp